Back to overview
Customer: Neubauer Bau
Sewer construction: placing concrete elements
Drainage
precats elements
excavator
The LUDWIG HOOK can shine not only when working at height. Working in civil engineering also entails dangers, especially if the subsoil is unstable. Loosening the sewer elements from a safe distance saves you from descending into the pit. This gives you time and promotes safety.
Product
LUDWIGHOOK
Industry
Civil engineering
Load
Other precast concrete
Attachment method
Direct
Related use cases
LUDWIGHOOK
Placing precast concrete walls onto special transport trailers
Concrete precast
walls elements
Loading
LUDWIGHOOK · ROBORIGGER
Roborigger in use during crane assembly in Sindelfingen
Crane Assembly
Tower Crane
LUDWIGHOOK
Exhibition construction: erecting a temporary façade
exhibition
temporary facade
assembly