Placement of reinforcing steel mesh to fix the river bank
Our customer Vinci Construction places reinforcing steel mesh on the embankment of the Garonne in Toulouse. For this operation, 2 LUDWIG HOOKS with 2T payload each are used. They can be released from a safe distance – one at a time or both at the same time. Note the slope of the dike! It becomes clear how useful it is to eliminate the dangerous and physically challenging climbing associated with manually releasing the load.